Funding
===Funding===
$25 million
$25 million


The project has several funding sources:
The project has several funding sources:


Build Portland
*Build Portland
HB 2017
*HB 2017
SDC
*SDC
HVUT
*HVUT
General Funds
*General Funds
ODOT
*ODOT
 
Portland Clean Energy Community Benefits Fund (PCEF)
Portland Clean Energy Community Benefits Fund (PCEF)
   
   
Sign up for email updates
===Sign up for email updates===


Map
[https://public.govdelivery.com/accounts/ORPORTLAND_ENT/subscriber/new?topic_id=ORPORTLAND_ENT_991 Sign up for email updates]
 
===Map===
+
+
  Leaflet | PortlandMaps
  Leaflet | PortlandMaps
Contact
 
Winston Sandino
===Contact===
Project Manager, PBOT
:Winston Sandino
winston.sandino@portlandoregon.gov
:Project Manager, PBOT
503-278-6277
:winston.sandino@portlandoregon.gov
Related
:503-278-6277
70s Greenway: Cully Connector
Topics
Transportation and roadsCity projects
Neighborhood
Cully
Topics
Transportation and roadsCity projects
See something we could improve on this page? Give website feedback.

Revision as of 10:19, July 16, 2025

The Portland Bureau of Transportation (PBOT) is constructing a new earthquake-ready bridge to provide better access for freight, pedestrians, and people biking. Bridge will fill the gap between the Holman Neighborhood Greenway and the NE 47th Avenue protected bikeway.

NE 42nd Avenue Bridge Replacement (over Lombard Street)
NE 42nd Avenue Bridge Replacement (over Lombard Street)

What’s happening now?

PBOT's contractor, Cascade Bridge, is expected to start construction on Aug. 4 with a full closure of the bridge. The closure will last approximately two years.

42nd Ave Bridge & Corridor - elevation drawing
42nd Ave Bridge & Corridor - elevation drawing

​ Rendering of the replacement bridge on NE 42nd Avenue, pictured here in a cross-section over Lombard Street and the railroad.

Background

42nd Ave Bridge & Corridor - section A
42nd Ave Bridge & Corridor - section A
42nd Ave Bridge & Corridor - section B
42nd Ave Bridge & Corridor - section B
42nd Ave Bridge & Corridor - section C
42nd Ave Bridge & Corridor - section C

The current bridge over NE Lombard Street is on a recommended Emergency Transportation Route but is vulnerable to earthquakes. Freight uses the bridge as a connection between NE Lombard Street and Columbia Boulevard, but the current bridge's height and weight restrictions limit freight transportation. In addition, the current bridge does not have enough room for pedestrians and people biking. This new connection would fill the gap between the Holman Neighborhood Greenway and the protected bikeway on NE 47th Avenue. When it's complete, the bridge will provide better access for freight, pedestrians, and people biking. 

Rendering A shows how the new bridge will look approaching from the north: a 6-foot wide buffered bike lane to the left, a 13-foot wide traffic lane in each direction, and a 10-foot wide multiuse path to the right.

Rendering B shows a cross-section of the bridge itself, with a 7-foot wide elevated bike lane on the left, 13-foot wide traffic lane in both directions, and a 10-foot wide multiuse path on the right side of the bridge.

Rendering C shows how the new bridge will look approaching it from the south: a 7-foot wide bike lane to the left, with a 3-foot buffer, a 13-foot wide traffic lane in each direction, and a 12-foot wide multiuse path to the right.

42nd Ave Bridge & Corridor - plan
42nd Ave Bridge & Corridor - plan

Overhead view of NE 42nd Avenue Bridge over Lombard Street and freight traffic.

Funding

$25 million

The project has several funding sources:

  • Build Portland
  • HB 2017
  • SDC
  • HVUT
  • General Funds
  • ODOT

Portland Clean Energy Community Benefits Fund (PCEF)

Sign up for email updates

Sign up for email updates

Map

+ −

Leaflet | PortlandMaps

Contact

Winston Sandino
Project Manager, PBOT
winston.sandino@portlandoregon.gov
503-278-6277